Clay arrives on site in container Trucks
unloading the clay
The panel pipes arrive on site and are unloaded
rough site grade carried out
curbs installed
Liners laid out ready for the water panels
Each water panel sits inside the liners to create cells
Each water panel pipe is connected together
Net post foundations sitting snug between the cell liners